Architecture and technical project
- Partner architect for the basic and execution project
- Quality specifications and permit drawings
- Geotechnical study and structural calculations
- Coordination with the Town Hall and project supervision

From architectural design to key handover. Transparent estimates and weekly reports. Building in Málaga, Marbella, and the entire coast.
Turnkey service
Materials factory-direct
Clear deadlines by contract
19 years on the market
We do not subcontract. Foundations, structure, installations, insulation, roofing and finishing — one in-house team of 30+ people.
5 phases from the first meeting to the handover of keys. Deadlines and payments written in the contract.
We meet, review the plot or sketch and assess feasibility. The architect prepares the basic and execution project while we coordinate engineers and the geotechnical team. The quality specification (memoria de calidades) is agreed with you and fixed in the contract.
We submit the project to the Town Hall and obtain the Major Works Permit (Licencia de Obra Mayor). Then we sign a contract with a fixed price per phases, deadlines and penalties for our delays. Prepayments are secured by advance protection.
Earthworks, reinforced concrete foundation, structure, walls, roof and thermal insulation. Quality control of concrete and steel. Weekly photo reports from the site — even if you are abroad.
Electrical, plumbing, sewerage, heating and ventilation. Then interior finishes: screed, plaster, tiling, painting, sanitaryware and kitchen installation. Quality control at every layer.
Final Works Certificate, First Occupancy Permit, new-build deed. 1 year on finishes, 3 years on constructive elements and installations, 10 years on the structure (decenal insurance). Utility connections on us.
A new build is a serious project. Here we explain why the result closes on price and time.
We founded the company in 2007. Since then — thousands of renovations and dozens of new builds from Marbella to Nerja. Our experience is not marketing, but specific decisions we have made in difficult situations: complex soil, long Town Hall approvals, non-standard projects. You get that experience in every decision we propose.
Fixed time every Thursday — Zoom or WhatsApp. We show the site live, discuss the next phase and lock in your decisions in the protocol. Plus daily photos from the site and videos of the key moments (foundation, structure, roof). No other contractor on the Costa del Sol does this systematically for clients abroad.
Cannot be on site? You get full control: video calls, photo reports, representation at the Town Hall and transparent decisions at every stage of the project.
“We started the project with a preliminary design from another architect. Nova Remont coordinated with him, refined the project and executed the build without losing the design intent. Impeccable WhatsApp communication.”
Dmytro P.
Mijas
“Nova Remont built our villa while we lived abroad. They handled the build, the permits, weekly photo reports. They delivered the house 3 weeks before the agreed date.”
Andrei K.
Marbella
“What convinced me most was the transparency. Every invoice matched a real milestone in the contract. They handled the occupancy certificate and the electrical certificates themselves, which saved me months of paperwork.”
Olena M.
Estepona
“I run a construction company in Germany and I know the sector. The quality of the structure, insulation and electrical installation is what should be demanded in Spain. 100% recommendable.”
Carlos R.
Benalmádena
“We built two homes on the same plot. They met the contract deadlines and helped us manage the self-developer mortgage with the bank. No surprises on the final price.”
Sokolov Family
Fuengirola
“We started the project with a preliminary design from another architect. Nova Remont coordinated with him, refined the project and executed the build without losing the design intent. Impeccable WhatsApp communication.”
Dmytro P.
Mijas
“Nova Remont built our villa while we lived abroad. They handled the build, the permits, weekly photo reports. They delivered the house 3 weeks before the agreed date.”
Andrei K.
Marbella
Yes. We work in Málaga, Marbella, Estepona, Benalmádena, Fuengirola and nearby municipalities. If you have a plot outside this area, ask us and we will study feasibility without obligation.
If you already own the plot, a Land Registry note (nota simple) and the cadastral plan are enough. If you have not bought it yet, we accompany you in the search and help verify buildability before you sign. For meetings without a purchased plot, we assess your needs and budget from scratch.
Yes. We have a partner architect for the basic and execution project, but we are happy to coordinate with yours from day one. The basic project, site supervision and the Major Works Permit stay with them or with us — we will agree at the first meeting.
The permit is issued in your name, so all rights to the project stay with you. You can stop after any phase and take the full documentation package (project, permit, technical reports). We only charge the cost of work actually done — no cancellation penalties.
10 to 14 months from the permit for a 200–350 m² villa. For larger projects (several homes, commercial + residential) the timeline is set in the project. The schedule is fixed in the contract and we compensate for delays caused by us.
The mandatory 10-year warranty in Spain (Ley 38/1999 LOE) covers structural damage affecting the mechanical resistance and stability of the building for 10 years. Additionally, 3 years on constructive elements and installations and 1 year on finishes. Everything documented in the contract.
Yes. We work with phased payments tied to actual build milestones (foundation, structure, roof, installations, finishes). That allows financing the build with a self-developer mortgage (hipoteca autopromotor) or a developer loan from the bank. Prepayments are protected by advance protection.
The price is fixed in the contract based on the project and the quality specifications. Changes requested by the client (larger area, different materials) are valued and signed separately before execution. We do not accept changes without your signature: zero surprises.
Free on-site visit anywhere within 150 km of Málaga.
and other Costa del Sol towns
Our team speaks 4 languages. No language barrier at any stage.
Tell us your ideas — we will come to assess the plot within 48 hours.
We reply within 15 min